Choose a location
with good ventilation and an air exchange rate of 4-5 times
per hour. A normal heating/air conditioning system will provide
3-6 air exchanges per hour. It should be located in a low
traffic area to minimize the potential for dust contamination,
yet be close enough to other functions in the lab for good
production flow. A separate clean environment is not necessary
(although a location right next an edger is not ideal either).
The work bench
on which the Coater and the Cure Unit will be placed should be approximately 36" inches in height. This height provides a comfortable working level for most operators. Some workers may need a working platform.
|
Electrical
Coating Unit---115 VAC/5 amps with grounded 3 prong receptacle
Cure Unit---115 VAC/12 amps with grounded 3 prong receptacle
Water
Deionized water is adequate for the cleaning system. A fice
gallon reservoir is supplied. A direct water source and/or drain
is not necessary for the Coating Unit.
Compressed Air
80 psi minimum and from a constant source not subject to fluctuation
of 7-8 CFM. Air regulators are supplied on the Coater and
Cure Units
Dimensions
Coating Unit - 21D x 25W x 36H
Cure Unit - 26D x 16W x 13H
|